Al Bayt Stadium and Energy Centre - Al Khor
Lead JV Partner on this 60,000 seating capacity stadium built for the Semi Final match of FIFA World Cup 2022, in Al Khor. The unique design is inspired by “Bayt Al Sha’ar” - A tent traditionally used by the Bedouins of the region. The tent structure covers an area of 265x 305 M and consists of an inner PVC Liner, and outer, with PTFE Fabric.
The other impressive and innovative elements are RCC Bowl, Escape Tunnels, Service Tunnels, Players Tunnels, Retractable Roof, Removable Upper Tier and an impressive Energy Centre with 100 MW cooling load, to provide the required cooling for the players and audience in the Stadium.
https://www.qatar2022.qa/en/stadiums/al-bayt-stadium/design
Doha Metro Red Line North
First underground Metro Rail Project in Qatar covering a distance of 13 Kms at a depth of 26 M, between Msheireb (Interchange Station) and Qatar University, with Twin Boring (7.60 M dia.) where in 1st TBM was witnessed by Qatari People. Completed successfully despite many challenges, in particular Dewatering since it was adjacent to the Sea and ran below the Residential Buildings & Office Complexes of West Bay; and below the Artificial Hill at KATARA. This was the Company’s first JV job with International Companies (M/s. Salini Impregilo S.p.A., Italy and M/s. S.K. Engineering & Construction Company, Korea). https://www.qr.com.qa/
Khalifa Stadium Energy Centre and Office Building
The design, build, and successful commissioning of the Khalifa Stadium Energy Centre that provides air-conditioning in the open air Khalifa International Stadium is one of Galfar Al Misnad’s biggest successes.
As the largest District Cooling Plant in Qatar, it is designed to meet a cooling load of 89000 TR. The innovative cooling technology we used in the Energy Centre not only reduced costs, but also conserved energy and space consumption, leading to this design being adopted as the standard for all the Energy Centres at FIFA World Cup 2022 stadiums.
Al Wakrah Logistics Park - Manateq
Design & Build of Infrastructure & Roads for Al Wakrah Logistics Park Phase 1. The design, build and successful handing over of the Al Wakra Logistic Park Parcel A & B covering 4.45 Sq. km of development for Economic Zone Company, Manateq. It is one of the largest Projects executed by Galfar Al Misnad and the scope comprises of 3 Million cum of Bulk earthworks, Site Grading for 4.5 Million Sq. m for developing 302 Plots, 52.50 Km of Asphalt Roads, 19 Km Asphalted Cycle Track, 61 Km of Tiled Walkway, 18 Km of Foul Sewer Network, 36 Km of Storm Water Network including deep injection wells with Retention Pond, 13.50 km of TSE Network, 38 Km of Firefighting Network, 42 km of Potable Network, 162 km of Electrical Network ( MV & LV), 23 Nos. of Secondary Substations, 47km of street lighting cabling and 1300 Nos. of Streetlight poles, 84km of Telecom Duct Network for Ooredoo, MOI & SSD & QAF, Pumping Stations and Storage Tank for Portable water, Fire Fighting, Foul & TSE, STP and Landscape works including Street Furniture.
Katara Cultural Village
A man-made hill of about 40 M height, on a marshy land, in an area of 60 Hectares, using the innovative Rapid Impact Compaction methods (RIC), 1st time in the history of Qatar. Also provided, the State- of-Art innovative Geo-Web cells for Plantation and Landscape along edges, which is a unique landmark Project in Qatar. Extensively visited & used by Locals/residents/visitors. The first major Infrastructure Project for the Division, with unique challenges.
Dukhan Flowline Project
Doha South STP
1st JV Job of the Division and Company, which was successfully completed and appreciated by all Stake holders, including Client & Subcontractors, etc. 1st Project completed on time, amongst other STP’s, awarded at same time. Unique features are open RCC Tanks, Lagoon, SBR, Sludge Building & discharge, including inlet and Outlet chambers; JV Partner for Design and Process is L&T, India.
CO2 Injection and Export Tie-Ins
The CO2 Injection and Export Tie-Ins Project provided the facilities to collect the carbon dioxide (CO2) rich streams (AGE absorber off-gas) from the Sulphur Recovery Units (SRU's) within RGX2 trains, and its injection; by utilizing the existing Acid Gas Injection (AGI) facilities.
The project involved the construction of 2.1Km of 48” header on 30-32 mtr high Pipe Racks and small bore piping (steam lines) of 15km, with hot insulation. The Structural Fabrication and Erection as part of new pipe rack and modification of existing pipe rack was 450 MTon. The total piping involved was about 45000”dia, as well as the painting/insulation of lines. There were nine hot taps varying from 2” to 4” size. The job included the installation of 28” MOVs and its associated E/I works.
In continuation to this project, Galfar Al Misnad is currently executing the CO2 WAG Injection Pilot Project which involves the construction of a 154km long 16” pipeline from this facility in Ras Laffan to Dukhan.
The project involved the construction of 2.1Km of 48” header on 30-32 mtr high Pipe Racks and small bore piping (steam lines) of 15km, with hot insulation. The Structural Fabrication and Erection as part of new pipe rack and modification of existing pipe rack was 450 MTon. The total piping involved was about 45000”dia, as well as the painting/insulation of lines. There were nine hot taps varying from 2” to 4” size. The job included the installation of 28” MOVs and its associated E/I works.
In continuation to this project, Galfar Al Misnad is currently executing the CO2 WAG Injection Pilot Project which involves the construction of a 154km long 16” pipeline from this facility in Ras Laffan to Dukhan.
GWC Warehouse and Office Building
Mesaieed Tanks
Engineering, Construction & Commissioning of 5 Nos. Tanks (Max: size 66 m dia) and associated facilities at Mesaieed. This included 02 Potable Water Tanks; 01 Fuel Oil Tank, an insulated tank with Column Supported Cone Roof; 01 Jet Fuel Tank, with Internal Floating Roof and External Dome Roof; and a Light Slope Tank with a single deck floating roof.
This massive project also involved the Piping Installation of 30,000 ID of process piping with steam tracing and insulation; the EPIC of 02 Transfer Pumps @ 150m3 per hour and 02 Loading Pumps @ 440m3 per hour, and multi stage Vertical Centrifugal Pumps for the Light Slope system; the EPIC of 02 Transfer Pumps for Potable Water system @ 550m3 per hour; the modification of piping / tie-ins with existing piping system including hot tapping; the engineering and construction of new switch gear room and controls; the EPIC of F&G detection system / Fire Water system with deluge skids.
Ashghal Kindergartens