Completed Projects

LIST OF MAJOR PROJECTS COMPLETED IN QATAR

Project Description Client Start / Completion Date
Design & Build of Infrastructure & Roads for Al Wakrah Logistics Park Phase 1 (WLC-A & B) Economic Zones Co. (MANATEQ) 02.08.2015 31.08.2017
Red Line North Under Ground Works (JV with Impreligo & SK) Qatar Railways Co. 13.06.2013 31.03.2018
Construction of the Infrastructure for the Residential Area The Katara Project 01.07.2010 31.03.2014
Doha South Sewerage Treatment Works Phase II (JV with L&T) Public Works Authority 27.06.2010 25.02.2016
The Cultural Village Project - Bulk Earth Work at CVP Phase III (including variation) Cultural Village Project 01.03.2008 30.04.2010
Engineering, Procurement and Installation of New Roads and Extension of Existing Roads at Ras Laffan (including variation) Qatar Petroleum   14.02.2005 14.12.2008  
Engineering, Procurement and Construction of the Dual Carriageway between Umm Baab and the Salwa Road (including variation) Qatar Petroleum 08.12.2003 06.06.2006
Construction of Roads Utility Crossing and Street Lighting in the Industrial Area Mesaieed (Package-3)(including variation) Qatar Petroleum 23.07.2006 22.03.2009
EPIC for Expansion of Khalifa Street, Ras Laffan to 3 Lanes & Protection of CCW Crossings at RLC Qatar Petroleum 20.04.2012 21.02.2014
EPC of Dual Carriageway, Roads and Associated Civil Works at Dukhan. Qatar Petroleum 09.03.2002 08.05.2003
Early Works Package for Lusail Stadium Precinct Supreme Committee for Delivery & Legacy 02.10.2014 02.06.2015
Sewer Repair, Replacement & Rehabilitation – Nuaija Lagoon 1A Public Works Authority 11.10.2017 21.06.2018
EPIC Two lane Dual carriage way between Umm Al-Berka Roundabout and the Main Gate at Ras Laffan Qatar Petroleum 15.01.1999 31.08.2000
Executing, Completion, Operation & Maintenance of Infrastructure for the Air Conditioned Training Track & Fan Zone Aspire Zone Foundation 22.06.2013 30.09.2014
Sewer Rehabilitation Plan of PS14/1 & PS23 Catchment Area (D_001) Public Works Authority 22.10.2017 19.04.2018
Maintenance of Roads within Doha Municipality Area (Zones 1-7, 10-28, 60) Ministry of Municipal & Urban Planning 31.08.2011 08.03.2014
Maintenance of Road works within Doha Municipality Area Ministry of Municipal & Urban Planning 01.07.2009 22.07.2011
Project Description Client Start / Completion Date
EPC of Seawater System Capacity Enhancement at RLOC Ras Laffan Olefins Co. Ltd. 18.02.2018 31.07.2020
EPIC for Wellhead Topsides, Manifold Platform, PS3 Modifications, Flowline & Umbilicals for Bul Hanine Redevelopment (Phase 1B) McDermott Eastern Hemisphere Ltd. 11.09.2018 30.10.2020
EPIC for Route Survey, Design, Construction, Installation & Hook-up of Oil Flowlines, Gas Lift Flowlines and PWI Spur Lines & Arab D Gas Production Well Lines for the Year 2016-2019 Qatar Petroleum 18.09.2016 16.05.2020
EPIC for various Pipeline PCRs in Dukhan Qatar Petroleum28.10.2018 27.04.2020
Construction of WOQOD Fuel Station at Al Khor Qatar Fuel (WOQOD)05.12.2018 04.12.2019
EPC of CO2 Injection & Export Tie-in Facilities RasGas Co. Ltd. 26.06.2016 31.01.2019
EPIC for Route Survey, Design, Construction, Installation & Hook-up of Oil Flowlines, Gas Lift Flowlines and PWI Spur Lines & Arab D Gas Production Well Lines for the Year 2013-2015 Qatar Petroleum 02.06.2013 01.12.2016
EPIC for Route Survey, Design, Construction, Installation & Hook-up of Oil Flowlines, Gas Lift Flowlines and PWI Spur Lines in Dukhan Fields (including variation) 2010-2013 Qatar Petroleum 28.04.2010 25.08.2013
Route Survey, Design, Construction, Installation & Hook-up of Oil Flowlines, Gas Lift Flowlines and PWI Spur Lines in Dukhan Fields (including variation) 2006-2010 Qatar Petroleum 07.12.2006 05.04.2010
Major Overhaul of Crude Oil Tanks T5003/4/8 & Replacement of 48" Headers of Tanks T5006/7/8/9, Halul (including variation) Qatar Petroleum 25.07.2007 19.09.2012
EPIC of New 5 Nos. Storage Tanks and Associated Systems at QP Refinery, Mesaieed Qatar Petroleum 05.02.2006 05.03.2008
EPIC for Produced Water Treatment & Injection (Dukhan fields: KM & KS Degassing Stations & PWI Stations PS-1) Qatar Petroleum 23.11.2009 22.07.2011
Engineering, Procurement, Installation & Commissioning of New Condensate Disposal Tank (T-13) at NGL Plants, Mesaieed (including variation) Qatar Petroleum 03.07.2005 02.01.2007
EPIC for Pre-requisites for Mothballing & Decommissioning of NGL-2 Plant, Mesaieed Qatar Petroleum 09.06.2016 08.12.2017
EPIC of Oily Water Effluent Pipeline in Dukhan Fields Qatar Petroleum 19.10.2009 14.06.2012
Subsidence Remediation of Crude Oil Storage Tank T-5508 Foundation at Halul Island Qatar Petroleum 10.05.2016 22.10.2016
EPIC for Extension of Manifolds at Jaleha, FS & KM Qatar Petroleum 01.08.2016 31.07.2018
Dukhan Consolidated Facilities Upgrade Project Petrofac / Qatar Petroleum 30.04.1998 23.12.1999
EPIC for Replacement of Oil Air Compressors at Khatiyah South, Fahahil South Degassing Stations & PWI Stations 2 and 3 Qatar Petroleum 15.01.2013 14.11.2014
Construction of WOQOD Fuel Station at Al Wakra South Area Qatar Fuel (WOQOD) 01.12.2015 30.12.2016
Civil & Building Works for Tank Area for QAPCO New Furnace at Mesaieed CTCI Corp. 06.10.2012 30.04.2014
EPIC of 2 Nos. Potable Water Storage Tanks of 3 MMIG Capacity at Dukhan. (including variation) Qatar Petroleum 24.01.2005 10.03.2007
EPIC for Butane Supply to QAFAC & QCHEM Mesaieed & New Surge Tank at Mesaieed Qatar Petroleum 16.09.2012 30.12.2015
Demolition of Two Existing Crude Oil Storage Tanks QJA-06 & QJA-10 and EPIC of Two Crude Oil Storage Tanks at Mesaieed Tank Farm. Qatar Petroleum 04.02.2002 31.12.2003
Design, Construction, Installation and Hook-up of Oil Flowlines and PWI Spurlines in Dukhan Fields Qatar Petroleum 05.09.2000 30.09.2003
Major Repairs & Upgrading works of C18 Storage Tanks (95-8118, 95-8112 & 95-8008) Qatar Chemical Co. Ltd. (Q-Chem) 28.02.2016 30.06.2017
Project Description Client Start / Completion Date
Engineering, Supply, Fabrication, Delivery, Installation, Testing &Handing-over of Kahramaa MV/LV Electricity Works Tekfen Construction Co. 15.04.2018 30.06.2021
Call-off Contract for Electricity Distribution Network Works KAHRAMAA 07.08.2014 18.12.2020
Design, Construction & Maintenance of the Energy Centre at Khalifa Stadium Aspire Zone Foundation 15.05.2015 31.05.2018
Call-off Contract for Supply, Install, Replace & Maintenance of Electronic Water Meters & Energy Meters KAHRAMAA 28.04.2015 27.10.2018
PIC of High Voltage (HV) Network in Dukhan Qatar Petroleum 16.11.2009 06.09.2015
Infrastructure Electrical works at Labour City, Mesaimeer (including variation) Al Ali Engg. Co. 16.06.2013 14.03.2016
EPC for New Canteen with Substation Facilities & Masjid Expansion Work Qatargas Operating Co. Ltd. 10.05.2013 09.11.2014
Call-off Contract for Electricity Distribution Network Works KAHRAMAA 03.05.2011 04.08.2014
EPIC for Replacement of Halon System in Refinery Qatar Petroleum 01.05.2011 04.12.2014
Call-off Contract for Electricity Distribution Network Works KAHRAMAA 06.10.2008 30.09.2010
Design, Engineering, Supply, Install, Testing & Commissioning of New (33/6.6kV) Substation Qatar National Cement Co. 18.11.2014 15.07.2016
Engineering, Procurement, Installation & Commissioning (EPIC) of New CIB 33/11kV Substation at Halul. Qatar Petroleum 12.04.2012 16.08.2014
EPIC for New Power Management System (PMS) at Halul Qatar Petroleum 05.09.2007 25.07.2009
Civil & Associated Building Works for 66/11kV New Doha D Substation & 132/11kV Framework Substation Siemens / KAHRAMAA 05.03.2014 31.05.2016
  Three Years Call-off Contract for Supply, Replacement, Maintenance & Installation of Domestic & Bulk Water Meters KAHRAMAA 05.08.2008 06.02.2012
Rectifier Station (Electrical Subcontract works including erection & welding Aluminium Bus Bars) ABB Switzerland Ltd. 06.09.2008 06.11.2009
  EPIC for New 33/11kV Power Distribution S/S at Halul Island Qatar Petroleum 13.11.2005 11.07.2007
EPIC for Conversion of 11kV Substation to 33/11kV Substation at Accommodation Complex at Halul Qatar Petroleum 26.06.2014 28.11.2018
Engineering, Procurement, Installation & Commissioning for 33kV Power Supply for Street Lighting of Umm Bab to Salwa Road Dual Carriageway Qatar Petroleum 13.06.2005 09.06.2007
Upgrading of Substations & Generator Facilities at the Sheraton Doha Hotel Qatar National Hotels Co. 21.09.2008 10.07.2010
Supply, Installation, Testing & Commissioning of 600mm Pre-insulated Chilled Water Pipes Imperial Trdg. & Contg. Co. W.L.L 19.02.2015 18.09.2015
Reinforced Concrete & Structural Steel Works for RC Tanks Qatar Kentz Engineers & Contractors 18.01.2016 09.02.2017
Call-off Contract for Electricity Distribution works (including variation) KAHRAMAA 18.07.2004 17.10.2006
Qatar Power Transmission System Expansion Phase 11 – Addendum Package C-14 – EHV Cable Works KAHRAMAA 07.05.2014 30.06.2018
Project Description Client Start / Completion Date
Construction, Completion and Maintenance of Proposed Data Centre at Qatar Science and Technology Park, Al Rayyan. MZA-BOP-PROC-RFP-PR1911 Meeza QSTP LLC 10.04.2020 27.09.2021
MEP (HVAC, Electrical (LSP) & Plumbing/Drainage) works at Substation (132/11kV) at Old Airport-2 AMCC/J281/FA/TC/20/04 Al Muftah 04.05.2020 28.03.2023
MEP (HVAC, Electrical (LSP) & Plumbing/Drainage) works at Substation (132/11kV) at Al Wajbah-2 AMCC/J282/FA/TC/20/05 Al Muftah 04.05.2020 28.08.2022
District Cooling Pipe Modifications and New DC Networks for Qetaifan Island North (QIN) Lusail City MQ-GALFAR/LD/DCPMNPW-QIN/21/059 Marafeq Qatar LLC 10.08.2021 14.09.2022
EPCC of Mechanical, Electrical & Plumbing works of the main contractor’s camp in RLIC (Q-Con Camp) Gulf Contracting Co. WLL 15.04.2023 12.03.2024
Supply & Installation of HVAC System – Qatar Umm Al Houl Power RO Expansion Project Samsung C&T Corp. 15.04.2018 30.06.2021
Execution of Reinforced Concrete, Structural & Building Works for Substation / ITR Building Qatar Kentz Engineers & Contractors 05.11.2015 15.05.2017
Construction of Six (6) Nos. New Kindergartens around Doha & Villages, Package 8 (including variation) Public Works Authority 23.03.2015 20.10.2016
EPC of Field Operations Building RasGas Co. Ltd. 24.12.2008 23.12.2009
Construction of Q5 Warehouse Qatar Fertilizer Co. (QAFCO) 21.02.2011 30.04.2012
  Additional Administration Office Building for Central Environment Laboratory Public Works Authority 03.04.2011 23.12.2013
Concrete Frame Work, Msheireb Down Town Doha – Phase 1B Carillion-QBC JV 02.04.2012 01.03.2013
Proposed Extension to Existing Arabic Channel Building Al Jazeera Satellite Network 20.12.2010 28.05.2012
EPIC for Support Services Area Phase-1 Site Development at New West Side of Ras Laffan Industrial City (including variation) Qatar Petroleum 20.08.2006 28.02.2009
Project Description Client Start / Completion Date
Maintenance Contract for all Civil, HVAC & MEP Systems in Health Centers for 3 Years Primary Health Care Corporation 01.06.2014 30.05.2017